# UmayShop — 14. Technical Debt, Risks, and Improvement Plans

> Translation note: This English machine draft preserves the source example snapshot. Language, publication and verification checklist values inside the example are historical sample content, not the current availability of this prototype. No human language signoff or real system verification is implied.

> **fictional example**: The text below is used to demonstrate how to fill out the template, and is not the actual implementation, permissions, deployment, or approval conclusion of UmayShop. Fictional examples cannot enter verified reference material.

Record legacy technologies, dependencies, and critical module risks based on evidence, without automatically promising remediation or determining vulnerabilities.

[Return to Main Table of Contents](../README.md) · [Unified Completion and Verification Rules](../AUTHORING-GUIDE.md)

## Table of Contents

- [Document Information](#文档信息)
- [Applicable Scope and Verification Conclusions](#适用范围与核验结论)
- [Risks and Technical Debt List](#风险与技术债务清单)
- [Technical Versions and Dependencies](#技术版本与依赖关系)
- [Priorities and Handling Plans](#优先级与处置方案)
- [Improvement Plan and Acceptance](#改进计划与验收)
- [Key Module Monitoring and Risk Acceptance](#关键模块监控与风险接受)
- [Sources, Final Decision, and Code Verification](#来源-最终决策与代码核验)
- [Attachments and Image Resources](#附件与图片资源)
- [Manual maintenance area](#人工维护区)
- [Language and Download Checks](#语言与下载检查)
- [Revision History](#修改历史)
- [Related Documentation](#相关文档)

<a id="文档信息"></a>

## Document Information

| Field | Content to Fill |
| --- | --- |
| content owner / Confirmer | Pending assignment / unconfirmed; compiled by is not an automatic approver |
| Technical Lead / Target Deadline | Azong / 2026-10-19; template takes effect only after their confirmation |
| Template Version / Current Status | 1.0.0 / example; unreleased |
| Project / Compiled by | UmayShop / Example author role |
| Applicable Version / Environment | Example dataset r1 / fictional test environment |
| Code repository / Collection branch / Full fixed commit SHA | Real snapshot not obtained; fictional examples do not fill in fake fixed commit SHAs |
| Most recent confirmation time / Confirmation basis | Unconfirmed / Confirmation record not obtained |
| Access classification | internal: Internal; increase classification when restricted information is involved, inheriting source permissions |
| Language / source revision | zh-CN / example-r1; English and Russian not yet generated |


<a id="适用范围与核验结论"></a>

## Scope of Application and Verification Conclusion

| Item | Conclusion |
| --- | --- |
| Coverage scope | Record legacy technologies, dependencies, and critical module risks based on evidence, without automatically committing to remediation or determining vulnerabilities. |
| Collection exclusions | umay/cis-mep and all its subtrees are not collected, not translated, not exported, and not counted toward acceptance |
| Verified Scope | Provides fictional example entries only, private code unverified |
| Number of verified reference materials | 0; this document did not perform real Issue/source code verification |
| Evidence credibility level | Actual system conclusions: low/unknown; confirmed requirement scope: high (single user source, not code proof) |
| Limitations / Gaps | Need to supplement final decision, confirmed permissions, exact SHA, implementation location, and verification records; do not extend front-end static checks into back-end or production conclusions |


<a id="风险与技术债务清单"></a>

## Risk and Technical Debt Inventory

> Instructions for completion: Technical debt is the maintenance cost incurred by deferring work; risk levels are based on impact and likelihood, not model confidence.

| ID / Category | Finding | Evidence | Impact Scope | Severity Basis | Status | Content owner |
| --- | --- | --- | --- | --- | --- | --- |
| R-EX-01 / Availability | Example single application node | Directory 02 single replica example | Query unavailable | Single point of failure example, level pending approval | Pending verification | Example operations role |
| R-EX-02 / Document quality | Export failure caused by missing diagram assets | INC-EX-01 | PDF integrity | Readers may misuse incomplete files | Example gap | Example documentation role |
| R-EX-03 / Dependency | Dependency lifecycle information not obtained | Dependency manifest but no official announcement evidence | Upgrade and maintenance | Vulnerability cannot be judged solely because version is outdated | To be verified | Example backend role |


<a id="技术版本与依赖关系"></a>

## Technical Versions and Dependencies

> Instructions: Obsolescence/vulnerability conclusions must be accompanied by official lifecycles or security bulletins and applicable versions; do not fabricate CVEs.

| Technology / Dependency | Current Evidence | Lifecycle / Announcement | Affected Modules | Judgment | Next Steps |
| --- | --- | --- | --- | --- | --- |
| Example framework 1.0 | Demo version only | Not obtained | Web / API example | Unknown, do not draw conclusion of obsolescence | Check official support scope and verify lockfile |
| Logistics service dependency | CARRIER-DEMO | Example external service | Delivery display | External failures may delay status | Check degradation and manual processes |


<a id="优先级与处置方案"></a>

## Priority and Remediation Plan

> Filling Instructions: Improvements can be fixes, monitoring, acceptance, or removal; approval is required, and requirements cannot be expanded automatically.

| Risk ID | Recommended measures | Priority / Reason | Estimation basis | Dependencies | Approval status |
| --- | --- | --- | --- | --- | --- |
| R-EX-01 | Evaluate standby nodes and recovery drills | Pending prioritization, test impact first | Time not estimated | Resource and operations approval | Not approved |
| R-EX-02 | Verify all images before export | Recommend prioritizing blocking the release of incomplete files | Existing failure sample | Documentation rendering pipeline | Not formally approved |


<a id="改进计划与验收"></a>

## Improvement Plan and Acceptance

> Instructions for completion: Dates are committed by the content owner; distinguish user target dates from specific fix deadlines.

| Action ID | Output | Owner | Planned Date | Acceptance Evidence | Completion Status |
| --- | --- | --- | --- | --- | --- |
| ACT-EX-01 | Recovery drill report | Pending assignment | Pending confirmation, do not automatically use overall target date | Actually tested recovery record | Not started |
| ACT-EX-02 | Missing image blocking test | To be assigned | To be confirmed | Tasks with missing images cannot be downloaded as full success | Not started |


<a id="关键模块监控与风险接受"></a>

## Key Module Monitoring and Risk Acceptance

> Instructions for filling: Retain residual risks, approval deadlines, and review events; risk acceptance does not equal resolution.

| Object | Monitoring Signal | Residual Risk | Acceptor / Deadline | Re-review Condition | Closure Evidence |
| --- | --- | --- | --- | --- | --- |
| delivery state | Delays and reconciliation discrepancies | Late external events | Not approved for acceptance | Interface or carrier change | Actual testing and confirmation by content owner |
| Requirement-code consistency | Disputed requirements entering main text | Erroneous documentation being misused | Cannot be automatically accepted | Issue final decision or code change | Re-verification and revision records |


<a id="来源-最终决策与代码核验"></a>

## Sources, Final Decisions, and Code Verification

**Inclusion rules**: First confirm "what the final decision is", then verify "what the target version actually did". Issue closure, the latest comment, title, or "resolved" are not sufficient to pass. Same period only indicates candidate association, not that it has been implemented.

| Evidence ID | Source Type / Location | Read Snapshot / Time | Independence and Completeness | Current Status |
| --- | --- | --- | --- | --- |
| EXAMPLE-E14 | Fictional requirements description + fictional code clues | No actual snapshot | Reposts from the same source do not count as independent sources; missing attachments must be marked | example_only |

| Decision ID | Issue / Comment ID / Time | Final decision and scope of application | Confirmer and permission basis | Alternative / Conflict Record | Decision Status |
| --- | --- | --- | --- | --- | --- |
| EXAMPLE-D14 | EXAMPLE-ISSUE / EXAMPLE-NOTE / fictional time point | Display unknown delivery state, do not presume delivered (fictional) | Authentic authorized confirmation records have not been obtained | Actual conflict unknown | unresolved |

| Final decision ID | Repository / Branch / fixed commit SHA | Implementation file:line number / symbol | Test or verification method / result | Code status / scope | Verifier / Time | Discrepancies and formal introduction conclusion |
| --- | --- | --- | --- | --- | --- | --- |
| EXAMPLE-D14 | Not obtained, do not use fake SHA | Real implementation location not obtained | Real verification not performed | unverified / none | Unverified / unconfirmed | Must not be introduced; review after supplementing evidence |

Decision status: `unresolved` (undecided), `confirmed` (validly confirmed), `superseded` (superseded). Code status: `unverified` (unverified), `partial` (partial only), `code_verified` (supported by fixed-version code), `runtime_verified` (tested and supported in target environment). **Static code support does not equal passing production execution.**

The following must be satisfied simultaneously: the final decision has been validly confirmed, there are no unresolved conflicts, relevant code coverage is complete, evidence is locatable, and manual verification records are complete, before it can be listed as verified reference material within its verified scope. Assertions involving deployment, permissions, or the real behavior of external services additionally require operational evidence from the corresponding environment. Historical decisions are retained as history and do not impersonate current rules.

| Gap ID | Missing evidence | Impact | Supplemental Owner / Deadline | Resolution Conditions |
| --- | --- | --- | --- | --- |
| GAP-14-01 | Real decisions and code snapshots | Cannot generate verified business conclusions | Pending assignment / Pending confirmation | Supplement and record verifier, time, scope, and result |


<a id="附件与图片资源"></a>

## Attachments and Image Resources

| Resource ID | Source / Ownership | Local Relative Path | Integrity / Read Status | Permission Boundary | Language Processing |
| --- | --- | --- | --- | --- | --- |
| Sample Attachment | Original attachment not provided | Not acquired | Not read, not included in verification | Inherits Issue and attachment access scope | Translations and resources not generated |

Attachments must record the original file URL, file name, content checksum, read time, and access classification; access tokens or signed temporary URLs must not be saved. That a link can be opened does not mean the body has been read. Redirection to a login page, corruption, encryption, or unrecognized scans are all marked as unread. Converted text must link to original documents and images, without overwriting the originals.


<a id="人工维护区"></a>

## Manual Maintenance Area

<!-- MANUAL:START -->
To be filled: explanations, exceptions, and operational notes confirmed by the person in charge. Subsequent automatic updates must preserve this section; submit diffs when conflicting with new evidence, and do not silently delete. This initialization script will not update existing content.
<!-- MANUAL:END -->


<a id="语言与下载检查"></a>

## Language and Download Checks

| Check Item | Current Status / Requirement |
| --- | --- |
| Chinese source | This page is in Chinese; source revision fixed by revision_id |
| English / Russian | Not generated. Subsequent automated translations bind to Chinese source revision (source_revision_id); after the source text is updated, old translations are marked as stale |
| Content structure | Translation preserves heading hierarchy, table of contents, tables, code, links, fields, and numerical values; terminology follows the project glossary |
| Images and In-Image Text | Original images and local assets are retained; Chinese text inside images must be separately remade or provided with translation notes; untranslated images are not counted as complete translations |
| Markdown download | When images are included, download as a ZIP containing Markdown + assets + resource manifest; must not provide only invalid remote links |
| PDF Download | Platform must implement pagination, table of contents/bookmarks, tables, Chinese/English/Russian fonts, and local image embedding; missing images should block complete success |
| Export and permissions | Bind document revision, language, image version, and template version; inherit source permissions and do not disclose restricted content |
| Package capability boundary | Only generates Markdown document tree and local diagram source/SVG; does not perform translation, PDF rendering, login, or platform publishing |


<a id="修改历史"></a>

## Revision History

| Revision | Date | Compiled by | Changes | Confirmation / Basis |
| --- | --- | --- | --- | --- |
| example-r1 | 2026-10-01 | Compiled by example role | Initialize fictional example | Unconfirmed / Template 1.0.0 |


<a id="相关文档"></a>

## Related Documents

- [01. Project Overview and System Architecture](../01-overview-architecture/README.md)
- [02. Infrastructure, Domain Names, IPs, and Access Permissions](../02-infrastructure/README.md)
- [03. Backend / Backend Service](../03-backend/README.md)
- [12. Monitoring, Logging, and Error Handling](../12-observability/README.md)
- [13. Deployment and Version Release Notes](../13-deployment-releases/README.md)